top of page

ANCHOR FOUNDATIONS

Shallow Embedment and no Heavy Machinery Required

What is an anchored foundation?

Anchored foundations are perfect for sites that require mounting directly to concrete, need shallow embedment and/or when heavy machinery is not permitted on site.

The X Anchor is our patented foundation solution that makes it possible to install large and small scale ground mounted solar PV systems with the use of only hand tools. Due to incredibly shallow embedment, the X Anchor can also be used on made-up ground such as former landfill sites - whilst retaining all cohesive resistivity required for successful installation and PV plant lifespan.

Direct Fix is an anchor bolt solution that is installed into concrete blocks. These solutions are often used in areas when deep embedment is not permitted, the concrete foundation already exists, or in areas prone to flooding.

Modular-62.jpg

X Anchor

X-Anchor Foundation .png

Name:

X Anchor (Patent Number: GB2607092)

Applicable with:

Twin post system

Suitable for: 

Sites that require shallow embedment and/or no heavy machinery

Installation: 

Steel rods driven with hand tools

Material:

Hot rolled steel (S355JR) hot dipped galvanised to ISO 1461.
S350 galvanised steel (ZM310).
Corrosion protection to be determined from site location and ground investigations

Dimensions:

Rod length determined by geotechnical and wind load test results

Design codes: 

Designed in accordance with
BS EN 1991-1-4:2005 +A1:2010. BS EN 1090 &
BS EN 1991 Parts 1, 3 & 7 (Eurocodes)

Direct Fix

Name:

Direct Fix

Applicable with:

Twin post systems

Suitable for: 

Non-cracked concrete foundations ranging between C20/25 &CS0/60

Installation: 

Torque controlled expansion bolts fitted into concrete with hand tools

Material:

Adjustable upright: S450 grade steel. Coatings: ZM800
Bolts: High tensile steel hot  dipped galvanised to EN 1461

Corrosion protection to be determined from site location

Dimensions:

M12 x 145mm torque controlled expansion bolts

Design codes: 

Designed in accordance with BS EN 1991-1-4:2005 +A1:2010. BS EN 1090 & BS EN 1991 Parts 1, 3 & 7 (Eurocodes)

Direct Fix Foundation.png

Have a project that you'd like to discuss?

Contact our expert team today.

Head Office

Solarport 

The Core

Gore Cross Business Park

Bridport

Dorset

DT6 3FH

South-West Factory

Solarport 

Units 5-8

George Smith Way

Lufton Trading Estate

Yeovil 

Somerset

BA22 8QR

Contact Details

Email: Enquiries@SolarportSystems.com
Head Office:

+44 (0)1308 800501
South-West Factory:

+44 (0)1935 488308

Policies

Privacy Policy

Cookies Policy

© 2025 Solarport Systems.

All rights reserved.

bottom of page